Acoustic Enclosure Tent

Published 7 December 2020 | No comments
Written by Paul Moran
CategoriesDust Noise
For removing the existing raft foundation, the team carried out a number of different methodologies to reduce noise, vibration and dust from the operation in consideration to the local residents. The best method they discovered was to encapsulate the works within a large acoustic tent enclosure. This assisted in retaining the dust, noise and vibration inside the work area where...