5.9 Vehicle loading and unloading

Summary

Principal Contractors shall ensure that vehicles are loaded and unloaded on-site as far as is practicable.

Principal contractors shall either:

  • Provide a stable, graded surface on-site for vehicle loading and unloading, or
  • Identify a suitable ‘off-loading’ area off-site

The Best Practice Hub is provided by the Considerate Constructors Scheme