Out Of Hours Energy Consumption Alarms

Published 4 April 2024 | No comments
Written by Jack Endean
CategoriesCarbon reduction Conserve of energy Monitoring and recording of resource usage
This contractor is tackling operational carbon through the utilisation of an energy monitoring system. This has a series of meters across the project office and site, electric supply and consumption can be monitored on an hourly basis. The biggest focus is on tackling out of hours consumption, with this system they are able to set email alarms which notify of...

Battery Operated Rebar Cutter

Published 4 April 2024 | No comments
Written by Jack Endean
CategoriesConserve of energy Energy efficient plant and equipment
This contractor have purchased a battery operated rebar cutter that eliminates the use of a petrol powered saw. By using this item it eliminates any hot works, when using a petrol saw it produces fumes and requires storage of flammables and any vibration associated hazards. There are also significant health and safety benefits for operatives on sites using this tool.

Hydrogen Powered Excavator 1 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 5

Published 29 January 2024 | No comments
Written by Jack Endean
CategoriesCarbon reduction Conserve of energy Energy efficient plant and equipment Green/renewable energy
The project team team have investigated and implemented the use of hydrogen powered plant, specifically JCB’s new hydrogen combustion forklifts. Hydrogen is zero carbon at point of consumption, meaning it will dramatically reduce site based emissions that normally come from diesel. This will enable sites to dispense with diesel or electric powered forklifts which emit high carbon emissions.

Hydraulic Manhole Lifter

Published 17 January 2024 | No comments
Written by Jack Endean
CategoriesCoaching for unsafe actions Controls Positive reinforcement for good safety practices
A contractor recently performed telecom remedial works to a manhole on the project. Typically, operatives would use a manual cast-iron manhole key, which poses a high risk of injury, especially back and arm injuries. Instead they utilised a hydraulic manhole lifter, a robust steel device capable of lifting up to 2 tons on nylon wheels. This initiative eliminates manual handling,...

Glassboy Floor Crane

Published 17 January 2024 | No comments
Written by Jack Endean
CategoriesCoaching for unsafe actions Controls Positive reinforcement for good safety practices
The specialist facade contractor are now in the remedial stage of construction, all elements and balconies have been installed, and now they are making repairs. Some of the glass has to be replaced, this can be a challenging task to carry out as the panels are extremely heavy. The contractor have decided to use a ‘Glassboy’ floor crane which connects...

Concrete Placing Boom

Published 17 January 2024 | No comments
Written by Jack Endean
CategoriesControls Health risk assessments and monitoring Positive reinforcement for good safety practices
For the superstructure construction, the frame contractor opted for a Spider placing boom to pour concrete. This choice enhances safety by reducing manual handling, as the boom is operated with a wireless controller, minimising the risk of slips and falls due to fewer pipes along the rebar, creating a clear walkway. Moreover, it also brings cost benefits by reducing labour...

Permanent Solar Panels used to Power Temporary Site Office

Published 7 December 2023 | No comments
Written by Jack Endean
CategoriesConserve of energy Conserve of resources Green/renewable energy
The office of this project has now been connected to the permanent solar panels on the roof of the block that facilitates the temporary office. This is the first instance for this company where the permanent installation of solar panels was accelerated in order to supply a temporary office and as a result, they are able to predominantly run off...

Noise Control for Hoist Operators

Published 6 November 2023 | No comments
Written by Jack Endean
CategoriesInspection and corrective action Noise
Hoist operators are subject to high levels of mechanical and plant noise on site throughout the day. Following guidelines this contractor has implemented noise dampening methods on their site using inexpensive materials readily available on site. To reduce the clanging of chains they have introduced a robust tape wrap, they have also utilised expansion foam used in brickwork joints for...

Temporary Fire Doors

Published 1 August 2023 | No comments
Written by Jack Endean
CategoriesConserve of resources Controls
Metal temporary fire doors are specialised doors made of durable steel. They provide fire protection, containing smoke and flames during emergencies. These doors have a specific fire rating (E60) which means they can withstand containing a fire for up to 60 minutes. They are low maintenance, reusable and over a long period of time will become cost effective. They also...

Temporary Flood Defense Wall

Published 9 January 2023 | No comments
Written by Jack Endean
CategoriesCarbon reduction Modern methods of construction Prevention of surface water run-off Protect the local environment
This contractor used an interlocking quick wall similar to hessian sand bags as a temporary flood defense wall. The quadruple baffle bags are made of PP fabric 240/30gm2, coated white and are UV resistant. The coating of the product is flexible and adaptable to any situation. The bags have a unique bottom release system for emptying. The bag system is...

Minimising Impact on Local Wildlife

Published 7 September 2022 | No comments
Written by Jack Endean
CategoriesBiofuels Defined plan to protect and enhance the natural environment
On this project they have invested and continue to invest in the green spaces and wildlife areas in their development. Every roof is finished with a green or brown roof, along with logs piles and other habitats promoting wildlife. In 2020 the project won the prestigious Sir David Attenborough award for its commitment to enhancing biodiversity. Systems are in place...

Tower Crane Torquer

Published 11 August 2022 | No comments
Written by Jack Endean
CategoriesControls Positive reinforcement for good safety practices
The torquer is a lifting accessory, which allows the user to control suspended loads and the orientation of the load in mid-air in order to lift and land in tight spaces without clashing with other objects and structures. This accessory is one of only two in the country, which if implemented more widely will reduce the risk of lifts clashing...

Tool Tethering Learning Hub 1 vote, average: 3.00 out of 51 vote, average: 3.00 out of 51 vote, average: 3.00 out of 51 vote, average: 3.00 out of 51 vote, average: 3.00 out of 5

Published 12 July 2021 | No comments
Written by Jordan Perrin
CategoriesControls and expected behaviours Falling objects
On this project they have come up with the idea of a Tool Tethering Learning Hub to help their operatives with understanding the importance of tool tethering to prevent injuries and near misses from occurring. Something they we stand by is ‘Nothing touches the floor’. This is very important as the site is a high rise frame with many of...

Collecting Real Time Information on Air Pollution

Published 22 February 2021 | No comments
Written by Jack Endean
CategoriesWorkplace dust monitoring
In conjunction with Time to Breathe and the British Safety Council the contractor is collecting real time information about air pollution via a free mobile app called Canairy. It calculates a user’s hourly exposure to nitrogen oxide, ozone and tiny particulates (PM2.5 and PM10) and draws on King’s College London’s Nowcast map of current air pollution in London and compares...

Illuminating Factory Chimney to Raise Awareness of Causes

Published 8 February 2021 | No comments
Written by Jack Endean
CategoriesSupport for local charities
As part of the refurbishment of the existing forty seven metre high, brick built factory chimney the contractor has installed an external lighting scheme that will allow them during the construction phase to project illuminated promotion of various awareness days or weeks to the public. This lighting system allows them to change the colours how they need them, as well...